The SEAI grant, explained simply
Up to €1,800 off your solar install.
The SEAI Solar Electricity Grant reduces the cost of putting solar panels on your home. How much you get depends on your system size. Here is everything you need to know about it.
How much can you claim
Grant by system size.
The grant is €700 per kWp on the first 2 kWp, then €200 per kWp up to 4 kWp, capped at €1,800.
| System size | SEAI grant |
|---|---|
| 1 kWp | €700 |
| 2 kWp | €1,400 |
| 3 kWp | €1,600 |
| 4 kWp or more | €1,800 (maximum) |
Figures per the current SEAI Solar Electricity Grant. Always confirm current rates on seai.ie.
Battery grant
A separate flat-rate €600 SEAI grant is available for a battery of 5kWh or larger. Combined with the solar PV grant, the maximum for solar panels and a battery is €2,400.
Enhanced grant
Where eligible, homeowners in receipt of certain Department of Social Protection payments (such as Fuel Allowance or Working Family Payment) can get up to €8,400 for a Solar PV system (up to 4kWp) plus a separate €600 SEAI battery grant for a qualifying 5kWh (or larger) battery, bringing the combined maximum to €9,000.
See the full list on seai.ieHow the grant works
From application to payment, in four steps.
- 1
Apply for grant approval
You apply to SEAI online for grant approval before any work begins. It is free.
- 2
Use an SEAI-registered installer
The work must be carried out by an SEAI-registered installer for the grant to count. Switch Electrical is registered, No. 50744.
- 3
Get your system installed
Once your grant is approved, your solar PV system is installed. Most homes are done in one to two days.
- 4
BER assessment and payment
A BER assessment is carried out after the works, then SEAI pays the grant directly to you.
Good to know
Eligibility and the official details.
- Your home must have been built and occupied before 2025.
- Your home needs an electricity meter number (MPRN).
- The address must not have had an SEAI solar grant before.
- You must have grant approval before any work starts.
- Once approved, the works must be finished within 8 months.
- The work must be done by an SEAI-registered installer. We are registered No. 50744.
- A BER (Building Energy Rating) assessment is required after the works.
- You are also paid for exported electricity under the Clean Export Guarantee (CEG).
Official sources: SEAI Solar Electricity Grant · SEAI Home Energy Grants
SEAI grant questions
How much is the SEAI solar grant?
Am I eligible?
How do I apply for the grant?
How long does the grant take?
Do I also get paid for exported electricity?
Is there a higher grant if I get a social welfare payment?
SEAI grant questions? We are here to help.
Enquire with Switch Electrical and we will answer anything you need to know about the SEAI solar grant, with no obligation.